It has guts

More progress.  All the 10 and 14 gauge wire has been run.  I need to finish the 22 gauge for the temperature probes and volt/amp meter.  The electrician will hopefully be installing my spa panel soon so I will be able to start testing the panel.

IMG_20140522_102731IMG_20140522_102737