eHERMS Build It has guts May 23, 2014 Daniel More progress. All the 10 and 14 gauge wire has been run. I need to finish the 22 gauge for the temperature probes and volt/amp meter. The electrician will hopefully be installing my spa panel soon so I will be able to start testing the panel.